What is the method for applying the Shinetsu Patch Seal?
We will introduce the application method of Shinetsu Patch Seal, which is effective for corrosion and waterproofing in the construction and civil engineering fields.
<Construction Method> 1. Pre-construction Adjustment The surface for laying the Shinetsu patch seal should be prepared by performing two types of scraping and washing with water to adjust the substrate. * Please confirm that the surface is completely dry before construction. 2. Preparation of Shinetsu Patch Seal Dimension adjustments can be made on-site using a cutter. After cutting, remove the separator film. 3. Application of Shinetsu Patch Seal Carefully apply the sheet without stretching it from top to bottom. After application, press the sheet with your hand to ensure it adheres well to the surface. The overlap width should be at least 20 mm, and secure it with tape as described in step 4. 4. Seal with Patch Tape Transparent to Complete Place the patch tape transparent over the edge of the patch seal and the substrate while still attached to the separator film, and press it down using a roller or similar tool over the separator film. Then, gently peel off the separator film in a 180-degree direction. After opening the package, please use it up within approximately 30 minutes.
- Company:FCR
- Price:Other